!
CAUTION: At least two installers are
required due to the weight and size of the
hood.
1. Install blower into Power Pack
AK8200AS - Blower is pre-installed
AK8300ASX - Refer to page 11 for instructions
Remove support screw from top of Power Pack
before installing into cabinet. FIG 2b
2. Install 8" round adapter to top of Power Pack. See page 11, step 3
for instuctions.
3. Install optional AK08xxAS Stainless Steel Liner. Review manual
included with liner for more details.
4. If no liner is used cut out an opening in the bottom of the cabinet by
following the dimensions in FIG 1.
5. Lift Power Pack into opening and secure to bottom of cabinet using
(4) M4 stainless steel screws, (1) in each corner; see FIG 2.
Note: Wood blocking may need to be added to cabinet base if
additional support is needed.
6. Install duct work and seal with duct tape.
7. Install electrical.
8. Remove all packing materials before using Power Pack.
Switch power on and check for leaks around duct tape.
9. Install baffle filters
minimum
minimum
3/4" wood base
3/4" wood base
metal or other non
combustible material
10
www.zephyronline.com
AK8200AS
AK8300ASX
26
34
"
1/16"
-
11/16
C/L
cabinet bottom cut-out size
FIG 1
Ductwork
Ductwork
elec.
elec.
Front View
Front View
(4) M4 ss wood screws
(1) in each corner
FIG 2
remove support screw
FIG 2b
C/L