Honeywell S9200U1000 Notice D'installation page 2

Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

S9200U1000 UNIVERSAL HOT SURFACE IGNITION INTEGRATED FURNACE CONTROL
Dimensions: See Fig. 1 on page 7
INSTALLATION AND
CONFIGURATION OVERVIEW
The following is an overview of the steps required to
install and configure the S9200U1000 Integrated Furnace
Control:
1. Identify cross reference target using Table 1.
2. Remove old device and carefully identify and mark
any wiring. See "Replacement" on page 6.
3. Mount the S9200U1000 Integrated Furnace Con-
trol. See "Replacement" on page 6.
69-2075EF—01
4. Connect the wiring harnesses and make the wiring
connections. See "Wiring" on page 7.
5. Configure the field settings and safety timings. See
"Safety Timings, Field Settings, and Fixed Parame-
ters" beginning on page 11.
CROSS REFERENCE
IMPORTANT
Only use the S9200U1000 on 120 Vac
applications.
See Table 1 for the replacement details for other
manufacturers' controls. See Table 2 for replacement
details for Trane controls.
2

Publicité

Table des Matières
loading

Table des Matières