Riello BOLLITORE 120 Lt Instructions Pour L'utilisateur page 51

Table des Matières

Publicité

Les langues disponibles
  • FR

Les langues disponibles

  • FRANÇAIS, page 20
− make sure that the interception devices of the water cir-
cuit are closed.
To empty the primary circuit (coil):
− connect a plastic hose to hose connector of the discharge
tap (1) and open the tap
− to help the water come out open the manual vent valve
1
To drain the secondary circuit (domestic hot water)
− connect a plastic hose to hose connector of the discharge
tap (2) and open the tap
2
− to help the water come out open a user's tap.
51

Publicité

Table des Matières
loading

Ce manuel est également adapté pour:

20132804505408

Table des Matières