OPERATION

Once all the hydraulic and electric connections have been done for the hydraulic priming of the pumps and collectors, proceed as
follows:
• close all the valves of the distribution
system
DANGER - ELECTRIC SHOCK RISK
From this moment any operations on pump ducts, pressure sensor, etc. must be done after having cut the
voltage off from the distribution board.
Press the [AUT/MAN] pushbutton for MANUAL start and subsequently push the [ON/OFF] pushbutton to start the desired pump. Verify
the rotational direction of the pumps.
CHECK THE DIRECTION OF ROTATION (ONLY THREE-PHASE PUMPS)
After starting the pump, press the [ON / OFF] button to stop the pump and check the direction of rotation. Perform the operation on all
pumps.
DANGER - ELECTRIC SHOCK RISK
If the two pumps have the direction of rotation reversed: Disconnect the power supply and invert two phases of
the general power cable from the electrical panel.
DANGER - ELECTRIC SHOCK RISK
If only one pump has the wrong direction of rotation: Remove power and reverse the wires in the terminals of the
contactor power for that pump.
Fig. 6
• open all the valves of the group,
included those of the membrane ways
BMS contacts (with fuse)
Pump control connectors,
pressure switch and absorption
control
Contactor control fuse F1
Power board fuse F2
GB
21