Pentair STA-RITE EASYBOOST Instructions De Service page 26

Table des Matières

Publicité

Les langues disponibles
  • FR

Les langues disponibles

  • FRANÇAIS, page 31
GB
S3=0110: 1 duty - 1 non cycle standby
S3
PIN
1
2
S3=0001
1 duty – 1 cycle assist
Rearming the electric timing alarm: After 5 minutes, the system will try three times to restart the electric pump under electric alarm
condition.
S3
PIN
1
2
S3=1000
1 duty – 1 cycle assist
Advanced configuration (service): Note: this configuration disables the normal operation of the group.
S3
PIN
1
2
PRESSURE SWITCHES CALIBRATION
CALIBRATION OF THE PRESSURE SWITCHES MOD. PY06
• Tighten almost to the maximum screw
A of the pressure switch
• Unscrew almost totally screw B of the
pressure switch
• Close all the points of collection
and bring the plant to the maximum
pressure by manual use of pump. Stop
the pump.
• Leave the switchboard predisposed for
MANUAL operation.
24
POS
1
0
3
4
POS
1
0
3
4
POS
1
0
3
4
• Open a point of collection and close it
when the circuit pressure has reached
the level which we intend to assign to
the first pump.
• Tighten screw B of the pressure switch
n.1 to the point where its electric
contact closes.
• Manually use the pump to raise the
network pressure and bring it to the
level that we want to assign to the
first pump.
• Unscrew screw A to the point where
the pressure switch n. 1 is opened.
• Repeat the operation on the other
pressure switch.

Publicité

Table des Matières
loading

Ce manuel est également adapté pour:

Sta-rite pressomat

Table des Matières