40
2
5
21 x4
STEP 6:
•
Attach the right butterfly brace (6) to the right standpipe (2). Secure with 1 screw
M10 x 155 (26) and 1 locking knob (35).
•
Insert the foam tube (15) into the opening of the right butterfly brace (6). Secure with
1 screw M10 x 20 (21) and 1 washer M10 (33). Then slide the padding (16) onto the
foam tube (15).
•
Insert the barbell rack (14) into the opening of the right butterfly brace (6). Secure
with 1 screw M10 x 20 (21) and 1 washer M10 (33).
•
Install the left butterfly brace (5) to the left standpipe (2) following the same
instructions.
•
Insert the locking pins (40) into the holes on the bottom of the upper cross bar (7).
SP-WB-003-B-IM-01.indb 33
SP-WB-003-B-IM-01.indb 33
35
33 x4
26 x2
21
2
6
21
33
35 x2
40 x1
33
33
15
16
26
14
5/14/2021 11:43:47 AM
5/14/2021 11:43:47 AM