Gas Supply - Empire Heating Systems DV-55E-5 Instructions Pour L'installation Et Manuel Du Propriétaire

Radiateur mural à circulation forcée avec un évent direct
Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

Consult the current National Fuel Gas Code, ANSI Z223.1 CAN/
CGA-B149 (.1 or .2) installation code.
Recommended Gas Pipe Diameter
Pipe Length
Schedule 40 Pipe
Inside Diameter
Nat.
0-10 feet
1/2"
0-3 meters
12.7mm
10-40 feet
1/2"
4-12 meters
12.7mm
40-100 feet
1/2"
13-30 meters
12.7mm
100-150 feet
3/4"
31-46 meters
19mm
Note: Never use plastic pipe. Check to confirm whether your local
codes allow copper tubing or galvanized.
Note: Since some municipalities have additional local codes, it is
always best to consult your local authority and installation code.
The use of the following gas connectors is recommended:
— ANS Z21.24 Appliance Connectors of Corrugated Metal Tubing
and Fittings
— ANS Z21.45 Assembled Flexible Appliance Connectors of
Other Than All-Metal Construction
The above connectors may be used if acceptable by the authority
having jurisdiction. The state of Massachusetts requires that a flexible
appliance connector cannot exceed three feet in length.
Installing a New Main Gas Cock
Each appliance should have its own manual gas cock.
A manual main gas cock should be located in the vicinity of the
unit. Where none exists, or where its size or location is not ad-
19563-6-0314

GAS SUPPLY

Tubing, Type L
Outside Diameter
L.P.
Nat.
L.P.
3/8"
1/2"
3/8"
9.5mm
12.7mm
9.5mm
1/2"
5/8"
1/2"
12.7mm
15.9mm
12.7mm
1/2"
3/4"
1/2"
12.7mm
19mm
12.7mm
1/2"
7/8"
3/4"
12.7mm
22.2mm
19mm
Figure 1
equate, contact your local authorized installer for installation or
relocation.
Compounds used on threaded joints of gas piping shall be resistant
to the action of liquefied petroleum gases. The gas lines must be
checked for leaks by the installer. This should be done with a soap
solution watching for bubbles on all exposed connections, and if
unexposed, a pressure test should be made.
Never use an exposed flame to check for leaks. Appliance must
be disconnected from piping at inlet of control valve and pipe
capped or plugged for pressure test. Never pressure test with
appliance connected; control valve will sustain damage!
A gas valve and ground joint union should be installed in the gas
line upstream of the gas control to aid in servicing. It is required
by the National Fuel Gas Code that a drip line be installed near
the gas inlet. This should consist of a vertical length of pipe tee
connected into the gas line that is capped on the bottom in which
condensation and foreign particles may collect.
Pressure Testing of the Gas Supply System
1. To check the inlet pressure to the gas valve, a 1/8" (3mm) N.P.T.
plugged tapping, accessible for test gauge connection, must be
placed immediately upstream of the gas supply connection to
the appliance.
2. The appliance and its individual shutoff valve must be
disconnected from the gas supply piping system during any
pressure testing of that system at test pressures in excess of
1/2 psig (3.5 kPa).
3. The appliance must be isolated from the gas supply piping
system by closing its individual manual shutoff valve during
any pressure testing of the gas supply piping system at test
pressures equal to or less than 1/2 psig (3.5 kPa).
Attention! If anyone of the procedures results in pressures in
excess of 1/2psig (14" w.c) (3.5kPa) on the fireplace gas valve,
it will result in a hazardous condition.
Checking Maniflold Pressure
Both propane and Natural gas valves have a built-in pressure
regulatior in the gas valve. Natural gas models will have a valve
outlet with the inlet pressure to the valve from a minimum of 5.0"
w.c. (1.245kPa) for the purpose of input adjustment to a maximum
of 10.5" w.c. (2.614kPa) Propane gas models will have a manifold
pressure apporximately 10.0" w.s. (2.49kPa) at the valve outlet
with the inlet pressure to the valve from a minimum of 11.0" w.c.
(2.739kPa) for the purpose of input adjustment to a maxium of
13.0" w.c. (3.237kPa).
A 1/8" (3mm) N.P.T. plugged tapping, accessible for test gauge
connection, is located on the outlet side of the gas control.
Page 7

Publicité

Chapitres

Table des Matières
loading

Ce manuel est également adapté pour:

4277

Table des Matières