3.1
Remove the hanger ball by loosening the Phillips head set
screw in the hanger ball until the ball falls freely down the
downrod (Figure 1).
Remove the pin from the downrod, then remove the
hanger ball (Figure 1).
Retain the pin and hanger ball for reinstallation in
Step 3.9.
3.2
Separate, untwist and unkink the two 80" motor leads.
Route the two 80" black and white motor leads through the
downrod (Figure 2).
3.3
Loosen the two Phillips head set screws in the motor
coupler for installation of the downrod (Figure 3).
Seat the downrod in the motor coupler (Figure 3).
Rotate and align the downrod holes with all the holes in the
motor coupler (Figure 3).
3. Ceiling Fan Assembly
5
PIN
HANGER BALL
PHILLIPS HEAD SET SCREW (LOOSENED)
Figure 1
TWO 80" MOTOR
LEADS (UNTWISTED)
Figure 2
DOWNROD
MOTOR
COUPLER
LOOSEN
SETSCREWS
Figure 3
Please contact 1-800-654-3545 for further assistance
GREEN GROUND WIRE
4.5" DOWNROD
DOWNROD
emersonfans.com
ETL Model No.: CF955L