Final Installation - Emerson MIDWAY ECO LED Mode D'emploi

Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

6.1
Lift the ceiling cover up to the threaded studs and turn until
studs protrude through the holes in the ceiling cover
(Figure 25).
Secure the ceiling cover in place by sliding lockwashers
over the threaded studs and installing the two knurled
knobs (supplied) (Figure 25).
Tighten the knurled knobs securely until the ceiling cover
fits snugly against the ceiling and the hole in the ceiling
cover is clear of the downrod.
WARNING
!
To avoid possible fire or shock, make sure that the electrical
wires are completely inside the outlet box and not pinched
between the ceiling cover and the ceiling.
6.2
Place the glass globe into the lower housing, aligning the
three flat areas on the top flange of the glass globe with
the three raised dimples on the inside of the lower housing
(Figure 26).
Then turn the glass globe clockwise until it stops turning.
NOTE: Periodically check that the glass globe is
seated fully clockwise in the lower housing.

6. Final Installation

NOTE: SUPPLY WIRES AND FAN WIRES OMITTED FOR CLARITY.
THREADED
STUD
Figure 25
FLAT AREA
OF GLASS
GLOBE
Figure 26
15
CEILING
COVER
LOCKWASHERS (2)
KNURLED
KNOBS (2)
LOWER
HOUSING
RAISED
DIMPLES (3)
emersonfans.com
Please contact 1-800-654-3545 for further assistance
ETL Model No.: CF955L
GLASS
GLOBE

Publicité

Table des Matières
loading

Ce manuel est également adapté pour:

Cf955lbs00Cf955lorb00Cf955lww00

Table des Matières