Demolition And Disposal - MASCHIO GASPARDO GENIUS LITE Emploi Et Entretien

Le système genius lite est à même de gérer la distribution d'un produit déterminé (semences et/ou engrais) et en même temps de contrôler le bon fonctionnement des principaux composants de la distribution
Table des Matières

Publicité

Les langues disponibles
  • FR

Les langues disponibles

7 DEMOLITION AND DISPOSAL

The Client is in charge of this operation.
Before its demolition, verify accurately the physical condition of the machine, ensuring that there are no parts subject to structural
failures or breakages during demolition.
The Client must comply with the laws in force in his country in terms of respect and environment protection.
Demolition operations must be carried out only by qualified personnel, equipped with suitable personal protective
equipment (safety shoes and gloves) and auxiliary tools and means.
The machine must be stopped and disconnected from the tractor to be dismantled for demolition.
Before demolition, we recommend disconnecting all the parts which can be source of danger and therefore:
contact specialised companies to scrap the structure,
remove the electric system complying with the laws in force,
separate oil and greases to be disposed of by authorised companies, complying with the Standards of the Country where
the machine is used.
During the machine demolition, the EC marking must be destroyed together with this manual.
Remember that the Manufacturer is always available for assisting if spare parts are required.
Code G19503490
USE AND MAINTENANCE
ATTENTION
EN
- 31

Publicité

Table des Matières
loading

Table des Matières