EN | Blast chillers | User and maintenance manual
In order to allow a good blast chiller/freezer functioning and a correct air circulation, during the positioning you
have to respect some minimum wall distance as follows:
Keep a minimum distance, corresponding to the door opening length, from the front unit grid view.
Keep a minimum 10 cm distance of the blast chiller back from the wall.

1.8 BLAST CHILLER WITH BUILT IN CONDENSING UNIT

The blast chiller is provided with built in condensing unit, therefore it is necessary not to obstruct the blast
chiller/freezer air inlet corresponding to the front grid for the air extraction in order to allow a proper air
circulation. Keep clear the whole blast chiller/freezer perimeter.
We remind you that room temperature rises or insuffi cient quantity of air to the unit condenser, reduce the
blast chiller performances with possible deterioration of the products and more energy consumption. If the
blast chiller/freezer with built in condensing unit was leant on the side during transportation we suggest you to
keep the product in upright position for at least 8 hours, before switching it on. In this way, you will allow the oil
to fl ow in all the components, lubricating them again. Afterwards you can proceed with the starting

1.9 BLAST CHILLER WITH REMOTE CONDENSING UNIT

For what concerns the electric connection, it is necessary to follow meticulously the electrical
rules in force. We remind you that all the operations must be performed by qualifi ed staff only.
The remote condensing unit must be placed far from atmospheric agents, avoiding using the
room where it is installed for storing goods, in order to assure air circulation.
According with the remote condensing unit characteristics, it is necessary to respect the space
from the wall and other obstacles, to ensure always and adequate circulation of air which grants
the correct functioning of the item and an easy maintenance.

2. ELECTRICAL CONNECTION AND EARTHING

2.1 ELECTRICAL POWER SUPPLY

The installation and the electrical connections must be carried out in conformity with the elec-
trical rules in force. These operations must be carried out by qualifi ed staff. The company declines
any responsibilities originated from the no observance of the above rules in force.
See the blast chiller electric diagrams at appendix – IV at the end of this manual.
Before plugging in the blast chiller, it is necessary to proceed with its complete and careful cleaning, using warm
water with no aggressive detergents and drying with a soft cloth all the humid parts (read with attention the
chapter regarding the blast chiller cleaning).
In order to carry out a correct plug in you must proceed as follow:
Prearrange a thermal magnetic circuit breaker switch and be sure that the frequency/tension of the
line corresponds to that shown on the blast chiller serial number label (see the label placing).
Verify the supply tension at the socket, it must be between +/- 10% when you start the compressor.
We recommend you to install a bipolar-switch (or 4 square pole switch) with contact opening of at
least 3 mm, at the head of the socket. This switch is obligatory if the loading is over 1000 W or when the blast
chiller is connected directly without the use of the plug. The mag thermic switch has to be placed nearby the