Starting operation
Solid Green
When the pressure indicator is solid green, the sprayer is
operating between 12 MPa (120 bar) and 23 MPa (230 bar). A
solid green pressure indicator means:
• The sprayer is at the proper pressure setting for spraying
oil-based and latex house paints
• The sprayer is operating at peak performance at a high
pressure setting
• If the pressure indicator goes to solid yellow when the
pressure is set so that it starts at solid green, it indicates
one of the following:
a. Tip Wear Indicator — when spraying with latex or at
high pressure the solid yellow appears. This means the
tip is worn and needs to be replaced.
b. Tip Too Large — when a tip that is too large for the
sprayer is put in the gun, the pressure indicator will turn
from solid green to solid yellow.
c. Fluid Section Wear — if a solid yellow pressure
indicator appears when using a new tip and the
pressure is set at maximum, service may be required
(worn packings, worn piston, stuck valve, etc...).

Service Indicator

The Service indicator is on when the motor is commanded to run.
This indicator is used by service centers to troubleshoot motor
problems.
4.3
Pressure control knob settings (Fig. 7)
1. Minimum pressure setting
2. Black zone – no pressure generation
3. Blue zone – pulsating pressure for cleaning
1
2
3
4.4

Connection to the mains network

The unit must be connected to an appropriately-
grounded safety outlet.
Attention
Before connecting the unit to the mains supply, ensure that the
line voltage matches that specified on the unit's rating plate.
The connection must be equipped with a residual current
protective device with INF ≤ 30 mA.
Titan's accessories program also includes
i
a mobile operator protection device for the
electronic supply, which can also be used with
other electronical equipment.
GB
4.5
Cleaning preserving agent when starting-
up of operation initially
1. Immerse the suction tube (Fig. 8, Item 1) and return hose
(2) into a container with a suitable cleaning agent.
2. Turn the pressure control knob counterclockwise (3) to
minimum pressure.
3. Open the relief valve (4), valve position PRIME
(k circulation).
4. Switch the unit (5) ON.
5. Wait until the cleaning agent exudes from the return hose.
6. Close the relief valve, valve position SPRAY (p spray).
7. Pull the trigger of the spray gun.
8. Spray the cleaning agent from the unit into an open
collecting container.
4
4.6
Taking the unit into operation with coating
material
1. Immerse the suction tube (Fig. 8, Item 1) and return hose
(2) into the coating material container.
2. Turn the pressure control knob counterclockwise (3) to
minimum pressure.
3. Open the relief valve (4), valve position PRIME
(k circulation).
4. Switch the unit (5) ON.
5. Wait until the coating material exudes from the return
hose.
6. Close the relief valve, valve position SPRAY (p spray).
7. Trigger the spray gun several times and spray into a
collecting container until the coating material exits the
spray gun without interruption.
8. Increase the pressure by slowly turning up the pressure
control knob.
Check the spray pattern and increase the pressure until
the atomization is correct.
Always turn the pressure control knob to the lowest setting
with good atomization.
9. The unit is ready to spray.