Preparing The Mounting Location - SMA GRID-CONNECT-BOX 12 Instructions D'emploi

Masquer les pouces Voir aussi pour GRID-CONNECT-BOX 12:
Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

5 Mounting
Recommended clearances:
200
Figure 5 : Recommended clearances (dimensions in mm)
☐ There must be sufficient space at the mounting location to ensure compliance with the recommended clearances.
☐ There must be a distance of at least 300 mm between the Grid-Connect-Box and the Multicluster Box. This will
ensure adequate heat dissipation for each product.
Dimensions for mounting:
Figure 6 : Outside base measurements and dimensions of the drill holes (dimensions in mm)
5.2

Preparing the Mounting Location

Danger to life due to fire or explosion if mounted at an unsuitable location
Mounting the product in areas with a high fire hazard can result in fire. This can result in death or serious injury.
• Do not install the product on flammable construction materials.
• Do not mount the product in areas containing highly flammable materials.
• Do not mount the product in potentially explosive atmospheres.
Additionally required mounting material (not included in the scope of delivery):
☐ 4 suitable screw anchors for attaching the product
Procedure:
1. On the support surface, mark the positions of the four drill holes for attaching the base (see Section 5.1,
page 13).
2. Drill holes at the marked positions.
3. Use screw anchors that are suitable for the support surface.
14
GRID-BOX-12-3-20-BE-xx-12
200
200
WARNING
300
62.5
475
Ø 13
380
598
SMA Solar Technology AG
200
200
Operating manual

Publicité

Table des Matières
loading

Produits Connexes pour SMA GRID-CONNECT-BOX 12

Ce manuel est également adapté pour:

Grid-box-12.3-20

Table des Matières