Mounting Steps - Lenze Global Drive EZN3-0022H150 Serie Instructions De Montage

Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

4
Electrical installation

Mounting steps

4.4
Mounting steps
How to wire the filter:
1. Deenergise the control cabinet and fuse it against re−energisation.
2. Connect the connection cables "Load" 2 to the basic device.
– Observe the documentation for the basic device!
3. Mount the PE conductor to the PE stud 1 using the ring cable lug.
– Observe tightening torque!
4. Connect the mains cables "Line" 0 to the mains.
5. Wire the terminals of the thermal contact 3.
– Integrate the thermal contact into the monitoring system so that the mains supply
is switched off when the filter is overheated.
– NC contact, switching capacity: 250 V AC / 1.6 A
– Connect the twisted cables.
– Observe tightening torque.
42
l
EZN−027
EDKZNXXXX−001 DE/EN/FR 3.0

Publicité

Table des Matières
loading

Table des Matières