4. FINAL STAGES

WARNING:
- Use manual tools and equipment that are suitable for the in-
tended purpose.
- Always protect the connection cables and pipes to prevent their
being damaged, as they could cause gas leaks when damaged.
(Personal injury from cold burns).
- Recharge the refrigerant gas in accordance with the instruc-
tions provided on the product safety data sheet, while wear-
ing protective clothing and avoiding sharp bursts of gas from
the tank or from the system connections. (Personal injury from
cold burns).
1. Wrap some insulating material around the joints of the internal
unit and fasten it in place using electric (insulating) tape.
2. Fasten the extra part of the signal cable to the piping or to the ex-
ternal unit.
3. Fasten the piping to the wall (fi rst cover the pipes with electric
insulating tape) using some clips or otherwise fi t the pipes into
plastic channels.
4. Use a suitable seal to fi ll in the hole in the wall through which the
piping passes so that no air or water can fi lter through.
5. Outside, insulate all the bare piping, including all valves.
6. If the piping has to pass above the ceiling or via a warm damp
place, wrap all pipes with some extra insulating material available
on sale to prevent condensation from forming.

4.1 Testing

Check the following points:
- INTERNAL UNIT
1. Are the ON/OFF and FAN buttons working properly?
2. Is the MODE button working properly?
3. Are the buttons for the set-point and TIMER working properly?
4. Do all the LEDs come on?
5. Are the fl aps used to direct the air fl ow effi cient?
6. Is the condensation drained regularly?
- EXTERNAL UNIT
1. Is there any noise or vibration during operation?
2. Could the noise, air fl ow or condensation drainage disturb the
neighbours?
3. Are there any refrigerant leaks?
NOTE:
The electronic control will only allow the compressor to start
three minutes after the unit has been powered.
HEAT INSULATION MATERIAL
PIPING
COUPLING
WALL
INSIDE
GB
INSULATING
TAPE
SEAL
OUTSIDE