Final Stages; Testing; Internal Unit; External Unit - Ariston PROTech ALYS R32 Manuel D'installation

Table des Matières

Publicité

Les langues disponibles
  • FR

Les langues disponibles

  • FRANÇAIS, page 57

4. FINAL STAGES

WARNING:
- Use manual tools and equipment that are suitable for the in-
tended purpose.
- Always protect the connection cables and pipes to prevent their
being damaged, as they could cause gas leaks when damaged.
(Personal injury from cold burns).
- Recharge the refrigerant gas in accordance with the instruc-
tions provided on the product safety data sheet, while wearing
protective clothing and avoiding sharp bursts of gas from the
tank or from the system connections. (Personal injury from cold
burns).
1. Wrap some insulating material around the joints of the internal unit
and fasten it in place using electric (insulating) tape.
2. Fasten the extra part of the signal cable to the piping or to the ex-
ternal unit.
3. Fasten the piping to the wall (fi rst cover the pipes with electric insu-
lating tape) using some clips or otherwise fi t the pipes into plastic
channels.
4. Use a suitable seal to fi ll in the hole in the wall through which the
piping passes so that no air or water can fi lter through.
5. Outside, insulate all the bare piping, including all valves.
6. If the piping has to pass above the ceiling or via a warm damp place,
wrap all pipes with some extra insulating material available on sale
to prevent condensation from forming.

4.1 Testing

Check the following points:

- INTERNAL UNIT

1. Are the ON/OFF and FAN buttons working properly?
2. Is the MODE button working properly?
3. Are the buttons for the set-point and TIMER working properly?
4. Do all the LEDs come on?
5. Are the fl aps used to direct the air fl ow effi cient?
6. Is the condensation drained regularly?

- EXTERNAL UNIT

1. Is there any noise or vibration during operation?
2. Could the noise, air fl ow or condensation drainage disturb the
neighbours?
3. Are there any refrigerant leaks?
NOTE:
The electronic control will only allow the compressor to start three
minutes after the unit has been powered.
HEAT INSULATION MATERIAL
PIPING
COUPLING
WALL
INSIDE
/ 55
GB
INSULATING
TAPE
SEAL
OUTSIDE

Publicité

Table des Matières
loading

Table des Matières