5.
Start-up operation
Once the meter has been installed, the components (calculator, volume
measuring component and both temperature sensors) must be sealed and
the meter taken into operation.
Check the display for a plausible indication of flow rate and temperatures.
Operating
Instructions
www.diehl.com/metering
6.
Expansion modules
The energy meter has two slots for expansion modules.
They can be mixed, but two pulse modules of the same kind must not be
installed.
The analog module occupies both positions.
These modules have no effect on consumption recording and can be fitted
retrospectively without damaging the verification mark.
The relevant ESD regulations (electrostatic discharge) must be
observed.
No liability is accepted for damage (especially to electronic cir-
cuits) resulting from failure to comply with the ESD regulations.
6.1 Installation of modules (Fig. III)
1. Open the calculator by releasing the side fasteners.
2. Lock the module into the appropriate slot and carefully connect the
pre-formed ribbon cable at both ends.
3. Close the lid and check the meter for correct operation by pressing the
push button. Renew the seal of the housing lid if the meter functions
correctly.