Pre-Installation Information - Bradley S19-671H Installation

Réservoir de 5 gallons avec douche oculaire et bande chauffant
Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

S19-671H, S19-671HR
Read this installation manual completely to ensure proper installation, then file it
Installation
with the owner or maintenance department. Compliance and conformity to drain
requirements and other local codes and ordinances is the responsibility of the installer.
Separate parts from packaging and make sure all parts are accounted for before
Packing List
discarding any packaging material. If any parts are missing, do not begin installation
T H
IS
E
S ID
U P
until you obtain the missing parts.
Flush the water supply lines before beginning installation and after installation is
complete. Test the unit for leaks and adequate water flow.
The inspection and testing results of this equipment should be recorded weekly
to verify proper operation. This equipment should be inspected annually to ensure
compliance with ANSI Z358.1.
Workers who may come in contact with potentially hazardous materials should be
trained regarding the placement and proper operation of emergency equipment per
ANSI Z358.1.
Fisher Safety
A Fisher Scientific Company
1-800-772-6733
For questions regarding the operation or installation of this product, visit www.
bradleycorp.com or call 800.BRADLEY (800.272.3539).
Product warranties and service parts information may also be found under "Products"
on our web site at www.bradleycorp.com.
Disconnect before servicing. Inspect cord for fraying. Make sure there is no visible
damage to the yoke's electrical system
Supplies Required:
• Pipe sealant
• Clean (free of oil and contaminants) air pressure equipment or supply capable of up to 100 psi.
• Sign-mounting hardware
2
WARNING
.
6/9/09
Bradley Corporation • 215-321A Rev. U; ECM 08-539
Installation

Publicité

Table des Matières
loading

Ce manuel est également adapté pour:

S19-671hr

Table des Matières