How the Rotary Dial Works
Note: The rotary dial can be turned in either direction.
Schedule
• Determines the days watering occurs by selecting:
• Specific days of the week (e.g. watering every MON and THU),
• Skip Days intervals, e.g., watering every 4 days, or
• ODD-numbered or EVN-(even) numbered days of the month.
Start Times
• Selects up to 3 different start times for each program.
Valve Run Times
• Sets how long each valve will water.
• The valve numbers correspond to the numbered terminals behind the
module. The valves run in numerical order; when one finishes, another
begins. You can set each valve to run from 0 to 59 minutes in 1 minute
increments, or 1.0 to 5.9 hours in 0.1 hour (6 minute) increments.
SPL FUNC (Special Functions)
• Clears all settings from a selected program
• Selects from among 5 different languages.
"%" (Water Budget)
• Increases or decreases all valve run times for a selected program. Watering
can be changed from 0% to 200% in 10% increments.
6