Test For The Drainage System - Gree GFH 09 EA-K6DNA1B/I Mode D'emploi

Climatiseurs split à conduite
Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

Notes:
①.The inclination height of the drain hose should be within 75mm so that the outlet
of the drain hose does not suffer the external force.
②.If multiple drain pipes converge, please follow the installation steps below.

12 Test for the Drainage System

a. After the electric installation, please take a test for the drainage system.
b. During the test, check if the water flow goes through the pipe correctly and
observe carefully the joint to see if it leaks or not. If this unit is installed in the newly built
house, it is suggested to take this test prior to the ceiling decoration.
Unitary Duct Split Unitary Duct Split
Fig.16
Fig.17
14

Publicité

Table des Matières
loading

Table des Matières