Ground Connection; Enclosure Configuration; Adding Or Removing Front And Rear Doors; Removing Doors - Tripp-Lite SmartRack SR42UBCL Guide D'utilisation

Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

4. Enclosure Installation
4.4 Leveling
( continued )
4
(Optional) If you wish to provide an additional measure of stability, you can attach the 2 shipping brackets,
using the hardware that attached the enclosure to the shipping pallet. Use a 13 mm open-end wrench to
connect the brackets to the outer
to secure mounting points in the floor using user-supplied hardware or Tripp Lite's SmartRack Bolt-Down
Kit (Part # SR331).

4.5 Ground Connection

All the parts of the enclosure should be grounded to the frame of the enclosure. Use the enclosure's front or rear
A
threaded grounding point
and an M6 screw (not included) to connect the frame of the enclosure directly to
your facility's earth ground connection with an 8 AWG (3.264 mm) wire (not included). Route the ground wire
under the enclosure's frame to ensure unhindered door operation. WARNING: Attach each enclosure to earth
ground separately. Do not use the enclosure without an earth ground connection.

5. Enclosure Configuration

5.1 Adding or Removing Front and Rear Doors

5.1.1 Removing Doors

1
Disconnect the door's ground wire.
2
Open the door until it is perpendicular (90 degrees) to the front of the enclosure.
3
Lift the door from the hinges and remove it from the enclosure.

5.1.2 Reinstalling Doors

To Reinstall Doors, Reverse Steps 1-3
(Optional) If the enclosure is joined to another enclosure, turn the door back toward the enclosure as you lift it from the hinges.
( continued )
A
B
or inner
bracket mounting points of the enclosure. Attach the brackets
4
1
2
3
6
B
A
A
90°
EARTH
GROUND

Publicité

Table des Matières
loading

Ce manuel est également adapté pour:

Smartrack sr48ubcl

Table des Matières