Installation And Connection; Installation - KNF SC 920 G Mode D'emploi

Systeme de vide
Table des Matières

Publicité

Les langues disponibles
  • FR

Les langues disponibles

Vacuum Pump System SC 920G
Cooling air supply
Installation location
Connected components
Coolant for high-performance
condenser
Translation of original Operating Instructions, English, KNF 334631-334633 07/21
6.

Installation and connection

 Only install the vacuum pump system under the operating
parameters and conditions described in chapter 4, Technical
data, page 8).
 Observe the safety precautions (see chapter 3, page 6).

6.1. Installation

 Before installation, store the vacuum pump system at the
installation location to bring it up to room temperature.
 Install the vacuum pump system so that the motor fan of the
pump can intake sufficient cooling air.
 Make sure that the installation location is dry and the vacuum
pump system is protected against rain, splash, hose and drip
water.
 Choose a safe location (flat surface) for the vacuum pump
system.
 Protect the vacuum pump system from dust.
 Protect the vacuum pump system from vibrations and jolts.
 Only connect components to the vacuum pump system which
are designed for the pneumatic data of the vacuum pump sys-
tem (see chapter 4, page 8).
A recirculating cooler or flowing cold water (or another cooling
medium) is needed to cool the high-performance condenser to the
condensation temperature.
Installation and connection
17
DE
EN
FR
ES
IT

Publicité

Table des Matières
loading

Table des Matières