Ingeteam Energy, S.A.
3.3. Main menu
The main menu is structured into the following sub-menus:
10:22
MAIN MENU
Monitoring
Configuration
Language
Change date
Monitoring
Displaying the values for the principal parameters and internal variables, providing details as to
the equipment operating status.
Configuration
This menu offers the possibility of changing various firmware parameters in order to adapt the
inverter to different operating conditions.
Language
This menu allows the user to select an available language.
Change date
To change the inverter date and time.
Start/Stop
This menu serves to manually run or stop the inverter operation.
Partial Data Reset
To zero the data stored in Part E, Tp con and Npcon.
This menu makes it possible to assign an identification number to the inverter within the PV
Change inv number
array.
3.4. Monitoring
Once monitoring menu Monitoring has been selected, click on
menu which allows you to select each of the three inverter output phases, as the data for each phase are displayed
separately. For example, to view Phase 1, this should be selected using keys
10:22
MAIN MENU
Monitoring
Configuration
Language
Change date
This leads to a series of six screen which display the principal
variables monitored. The screen on the right shows the first
variable.
To scroll from one screen to another, use keys
Listed below is a description of the variables in each particular screen.
Screen 1
Pout
Power (W) delivered by the inverter to the Electric Grid.
Vac
Output voltage (V) of the inverter at the Electric Grid connection.
Iac
Inverter output current (A).
Fac
Current output frequency to the Electric Grid (Hz).
20
14/04/11
OK
14/04/11
and
.
10:22
MAIN MENU
Change date
Start/Stop
Partial Data Reset
Change inv number
to access the same. The first screen displays a
and
then click on
10:22
MONITORING
Phase 1
Phase 2
Phase 3
10:22
MONITORING Phase 1
Pout
5000 W
Vac
239 V
Iac
21.83 A
Fac
49.89 Hz
PhiCos
0.998
User manual
14/04/11
OK
.
14/04/11
14/04/11
AAY2000IKE03