Airzone FLEXA 3.0 IBPRO6 Guide D'installation page 19

Table des Matières

Publicité

Les langues disponibles
  • FR

Les langues disponibles

  • FRANÇAIS, page 27
3.- Connection to the ducted unit
-
Through gateway: Connect the communication gateway to the AC unit port of the main control board
connect it to ducted unit, follow the instructions of the communication gateway. It is recommended to install the
thermostat of the unit. For the connection of DIN rail gateways, use (2x0.22 mm
-
Through Start-Stop: Use the main control board relay
manufacturer's instructions. I
4.- Other peripherals (AZCE6OUTPUT8, AZX6CCP
You can find the instructions on how to connect and configure other peripherals on their data sheets.
5.- Powering the system
Use the power input to power at 110/230 Vac
and any others control elements that require it. Use the appropriate
cable (3x1.5 mm²). For added security, secure the wires using the turret.
Important: According to the current local and national regulations, it is mandatory to add a switch (or other element to
disconnect the system) to the external supply wiring so that a constant separation between poles is guaranteed. The system
will restart automatically if the supply is eventually turned off. Use an independent circuit from the controlled system for
the power supply.
Remember: Once all the connections are made, make sure you replace the cover properly.
1 A, V
24 / 48 Vdc.
max
max
the main control board
) Airzone wire.
2
to perform the start-stop of the unit following the
. In order to
ES
EN
FR
IT
PT
DE
19

Publicité

Table des Matières
loading

Ce manuel est également adapté pour:

Flexa 3.0 ibpr06

Table des Matières