dirna Bergstrom bycool green line INTEGRAL POWER Instructions De Montage page 13

Masquer les pouces Voir aussi pour bycool green line INTEGRAL POWER:
Table des Matières

Publicité

Les langues disponibles
  • FR

Les langues disponibles

INTEGRAL POWER
Position the seal joint, side seals and front
4
seal inside the compact as shown.
a
b
c
Pass the cabling through the borehole (T)
5
made for this purpose in the roof (figure 1).
Position Integral Power (A) with (6) 13 mm
pieces of bushing, rubber washers and (6)
M6/100x40 screws (B) and nuts M6/100.
Important: Ensure sealtightness between
!
the unit and the ceiling in order to prevent
any water coming in.
Insert rubber washers to prevent water
6A
passage.
Seal the boreholes with silicone.
6B
Seal joint
Side seals
Front seal
b
5
A
6A
13
c
B
C
M6/100 nut
flat washer
rubber washer
unit base
bushing
vehicle roof
flat washer
screw M6/100
EN
®
a
b
5

Publicité

Table des Matières
loading

Table des Matières