dirna Bergstrom bycool green line INTEGRAL POWER Instructions De Montage page 12

Masquer les pouces Voir aussi pour bycool green line INTEGRAL POWER:
Table des Matières

Publicité

Les langues disponibles
  • FR

Les langues disponibles

INTEGRAL POWER
EN
Position the Integral Power unit on the roof,
1
taking into account that the final position must
correspond to the front supplied, ensuring it
is on a flat surface.
Once the position is defined, remove the case
2
and mark (6) boreholes (Y), then align the (4)
template boreholes with the (4) rear boreholes
in the roof (figure 3).
Note the arrow indicating the operation
direction.
Mark and make the cuts and boreholes (protect
3
the sharp edges with anti-oxidant).
620 mm
585 mm
T
Y
3
Ø 7 (4)
OPERATION DIRECTION
Y
12
®
1
Ø 32

Publicité

Table des Matières
loading

Table des Matières