Napoleon LV50N Instructions D'installation Et D'opération page 27

Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

METAL STUDS REQUIRED TO ENSURE CLEARANCE TO COMBUSTIBLES.
IMPORTANT: Before fi nishing in the appliance test the operation using the remote control, cycling it
through all of its different modes, see "OPERATION" section. Should trouble shooting be required,
access to the controls can be made through the pre-fi nishing access panel.
75 1/4"
1911mm
MINIMUM
50"
1270mm
MINIMUM
NOTE: Power vent system available with reduced
vent pipe clearances. Contact your authorized
dealer / distributor for more information.
WARNING
!
65 3/8"
1661mm
METAL STUDS (NOT MANDATORY)
16 1/4"
413mm
27
EN
W415-1439 / A / 07.10.15

Publicité

Chapitres

Table des Matières
loading

Ce manuel est également adapté pour:

Lv50n2Lv50pLv50p2

Table des Matières