Télécharger Imprimer la page

Fontanot ZEN 2 TUBE Instructions De Montage page 7

Publicité

Les langues disponibles
  • FR

Les langues disponibles

Join the handrail A22 elements to articles B33 and D72 using the X01 glue. Saw off the excess
handrail next to the first and last baluster using a hacksaw and complete assembly by inserting
element A37 using article C64 and X01 glue (fig. 1).
17. Determine the length of the A39 bars based on the dimensions of the staircase and cut them.
Insert the A39 bars into parts BG1 previously assembled on the CB6 balusters (Fig. 1-1a).
Assemble parts D40 and C76 on the CL9 starting baluster and slide the A39 bar inside them
letting it protrude 15mm from the edge of part BG1. Fit part D38 at the end of the bar and tighten
it with part C76 (Fig. 1). Secure the bar by tightening part C76 placed on part D40. Continue
with assembly of the rest of the A39 bars joining them to each other using part A41 and the glue
provided (Fig. 1a).
Final Assembly
18. Check the verticality of the entire staircase and - if necessary - correct by moving support N16
(fig. 1).
19. Dismantle the first L73 tread and drill the floor using a Ø 14 mm point in the same place as the
openings found on support N16 (fig. 1).
20. Insert elements C39 and secure in a permanent manner (fig. 1).
21. Remount the first L73 tread.
22. To further stiffen the staircase, fasten parts F09 to the wall and join them to the CB6 balusters
using parts F08. Drill using an 8mm Ø bit and use parts C50, C49, C58, B12 (Fig. 1a).
067807000_istr_montaggio_ZEN_2_TUBE_DUM_09-17.indd 7
7 - ZEN 2 TUBE
27/09/17 12:18

Publicité

loading