Minimum Combustible Mantel Clearances; Non-Combustible Facing Material - Napoleon Vittoria GD19N-2 Manuel D'installation Et D'opération

Pour usage intérieur seulement. certifié selon les normes nationales canadiennes et américanes: csa 2.22 et ansi z21.50 pour les appareils à gaz décoratif à évacuation
Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

finishing
EN
9.4

minimum combustible mantel clearances

WARNING
!
Risk of fi re. Maintain all specifi ed air space clearances to combustibles. Failure to comply with these instructions
may cause a fi re or cause the appliance to overheat. Ensure all clearances (i.e. back, side, top, vent, mantel,
front, etc.) are clearly maintained.
When using paint or lacquer to fi nish the mantel, the paint or lacquer must be heat resistant to prevent
discolouration.
Mantel clearance can vary according to the mantel depth. Use the graph to help evaluate the clearance needed.
Combustible materials must be installed flush with the front of the appliance but must not cover any of the black
face-area of the appliance. Non-combustible material (brick, stone or ceramic tile) may protrude past the face of
the appliance.
note:
Mantels can be installed according to the chart
below until the ceiling height is met.
M
A
N
T
E
L
H
E
I
G
H
T
9.5

non-combustible facing material

WARNING
!
Non-combustible facing material may protrude past the face of the opening relative to its depth. If it does,
it is considered a non-combustible protrusion and must meet the non-combustible protrusion clearance
requirements.
FINISH
MATERIAL
FRONT OF
APPLIANCE
44
W415-2355 / A / 12.09.20
MANTEL DEPTH
SIDE VIEW
NON-COMBUSTIBLE
FACING MATERIAL
3/4" (19mm)
MANTEL
8"[203mm]
8"
[203mm]
6"
[152mm] 4" [102mm]
TOP OF
2" [51mm]
FIREPLACE
TOP VIEW
FRONT OF
APPLIANCE
3/4" (19mm)
45.4
6" [152mm]
4" [102mm]
2" [51mm]
FINISH
MATERIAL
NON-COMBUSTIBLE
FACING MATERIAL

Publicité

Chapitres

Table des Matières
loading

Ce manuel est également adapté pour:

Vittoria gd19p-2

Table des Matières