Starting The Device - Leister GEOSTAR G5 Instructions D'utilisation

Masquer les pouces Voir aussi pour GEOSTAR G5:
Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

Speed and temperature setting during welding
If the drive is switched on, then the welding parameters of temperature and speed in the Working display (34)
are set as follows:
• The Speed function display (34) is blocked during welding.
• Briefl y pressing the "e-Drive"
"e-Drive"
.
• The speed is blocked after 5 seconds or by pressing the "e-Drive"
• The speed can no longer be adjusted.
• The "Down" arrow key (28) can be used to set the cursor on the Heating working display and the temperature
setpoint can be modifi ed by rotating the "e-Drive"
Speed blocked

Starting the device

• If necessary, mount the respective drive/pressure rollers (16/17) and set the desired transmission ratio (see
Chapter "Change gear speed").
FI
• The welding wedge has been set to a factory setting for 2 mm membranes (see Chapter Welding wedge position
factory setting).
• Switch the wedge welder on via the main switch (2).
• Set the welding force, the contacting system and the lower drive/pressure roller (17) (see Chapter "Setting the
welding parameters" and Chapter "Adjusting the lower pressure roller").
• Set the welding parameters (temperature/speed) (see Chapter "Speed and temperature setting before welding").
• Switch on heating with the "Heating On/Off" button
down for 1 sec. Afterwards an acoustic signal is sounded and "Heating on" appears briefl y on the display.
enables the speed setting and the speed can be modifi ed by rotating the
Release speed
Connect the device to the nominal voltage. The nominal voltage specified
on the device must match the mains voltage.
.
. The set value is applied immediately.
. The heating button
Speed blocked
must be kept pressed
55

Publicité

Table des Matières
loading

Ce manuel est également adapté pour:

Geostar g7

Table des Matières