Nailing Tab Installation - Napoleon BL36 Instructions D'installation Et D'opération

Masquer les pouces Voir aussi pour BL36:
Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

32
Minimum clearance to combustible construction from appliance and vent surfaces:
Combustible Framing:
EN
-
0" to stand-offs
-
1" (25mm) to bottom and sides of the vent pipe*
-
3" (76mm) to top of the vent pipe*
Combustible Finishing:
-
0" to rear stand offs
-
4 1/2"(114mm) to front face top and 3"(76mm) to sides
-
53" (1346mm) to combustible enclosure top from base of the appliance
-
53" (1346mm) to ceiling from base of the appliance
* BL36 HORIZONTAL VENT SECTIONS: A minimum of 1" (25mm) at the bottom and sides and 3" (76mm)
at the top of the vent pipe on all horizontal runs to combustibles is required. Use fi restop spacer W010-1800
(supplied).
NOTE: The minimum clearances from the top of the horizontal vent pipe to combustible materials may
be reduced from 3" (76mm) to 1" (25mm) in those installations with a minimum 38" (965mm) vertical
vent rise made immediately off the fi replace collar.
* BL36 VERTICAL VENT SECTIONS: A minimum of 1" (25mm) all around the vent pipe on all vertical runs
to combustibles is required except for clearances in appliance enclosures. See "MINIMUM ENCLOSURE
CLEARANCES" section. Use fi restop spacer W500-0096 (not supplied).
31 7/8"
810mm
5.2

NAILING TAB INSTALLATION

USE A SELF TAPPING SCREW TO SECURE SHORT SIDE OF NAILING BRACKET TO APPLIANCE. REPEAT FOR STEPS 2,3 AND 4.
W415-1442 / C / 06.06.16
1
4
NOTE: ADJUST BRACKET TO SUIT YOUR DESIRED FINISHING MATERIAL.
OUTSIDE
CHASE
16 3/4"
425mm
2
3
16 3/4"
425mm
INSIDE
CHASE
SIDE
WALL
2" 51mm

Publicité

Chapitres

Table des Matières
loading

Ce manuel est également adapté pour:

Bl36nteBl36pte

Table des Matières