Napoleon BL36 Instructions D'installation Et D'opération page 18

Masquer les pouces Voir aussi pour BL36:
Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

18
Simple venting configurations.
EN
For vent configurations requiring more than two 90° elbows the following formulas apply:
Formula 1: H
< 3V
T
Formula 2: H
+ V
T
Example:
V
= 2 FT (0.6m)
1
V
= 1 FT (0.3m)
2
V
= 1.5 FT (0.5m)
3
V
= V
+V
+V
= 2FT (0.6m) + 1FT (0.3m) + 1.5FT (0.5m) = 4.5FT (1.4m)
T
1
2
3
H
= 6 FT (1.8m)
1
H
= 2 FT (0.6m)
2
H
= H
+ H
= 6FT (1.8m) + 2FT (0.6m) = 8 FT (2.4m)
R
1
2
H
= .03 (four 90° elbows - 90°)
O
= .03 (360° - 90°) = 8.1 FT (2.5m)
H
= H
+ H
= 8FT (2.4m) + 8.1FT (2.5m) = 16.1FT (4.9m)
T
R
O
H
+ V
= 16.1FT (4.9m) + 4.5FT (1.4m) = 20.6 FT (6.3m)
T
T
Formula 1:
Since this formula is not met, this vent configuration is unacceptable.
Formula 2:
Since only formula 2 is met, this vent configuration is unacceptable and a new appliance location or vent configuration
will need to be established to satisfy both formulas.
W415-1442 / C / 06.06.16
REQUIRED
VERTICAL
RISE IN FEET
(METERS) V
T
< 40 feet (12.2m)
T
H
< 3V
T
T
3V
= 3FT (0.9m) x 4.5FT (1.4m) = 13.5FT (4.1m)
T
16.1FT (4.9m) > 13.5FT (4.1m)
H
+ V
< 40 feet (12.2m)
T
T
20.6FT (6.3m) < 40 (12.2m)
(H
) > (V
)
T
T
See graph to determine the required vertical rise V
required horizontal run H
20 (6.1)
19 (5.8)
10 (3.1)
T
3 (0.9)
0
5
(1.5)
(3.1)
HORIZONTAL VENT RUN PLUS OFFSET IN FEET (METERS) H
The shaded area within the lines represents acceptable
values for H
90°
V
1
.
T
25
10
15
20
(7.6)
(4.6)
(6.1)
and V
T
T
90°
H
2
H
V
1
2
90°
18.1_2B
for the
T
30
(9.1)
T
V
3
90°

Publicité

Chapitres

Table des Matières
loading

Ce manuel est également adapté pour:

Bl36nteBl36pte

Table des Matières