Ssang Yong Musso Sport P.U.
05/2004 - ....
Ref. 1470
Fitting instructions
1)
Remove the spare wheel, remove the exhaust out of the filling up rubber and let this one sink as much as
possible.
2)
On the inside of the chassis beam, completely at the back, are 2 drillings provided on both sides, these
drillings have to be enlarged till ø19,5mm, insert the filling tubes through these drillings in the chassis
beams. Place, in the corner of the cross beam and the chassis beam, the mounting pieces 4 (at the right)
and 5 (at the left) with points (A) matching the drilling where the filling tube was inserted and with
points (C) matching the big drilling in the cross beam. Insert the bolts and washers by (A) and place
mounting pieces 2 (left and right) on the outside of the chassis beam with points (A) on the inserted bolts,
do not tighten yet.
3)
Place the tow bar with points (B) and (C) against the back side of the cross beam matching points (B) and
(C) of the already mounted points 2, 4 and 5. Insert the bolts but do not tighten yet.
4)
Place the mounting pieces 6 (at the left) and 7 (at the right) with points (D) against the underside of the
the chassis beams on the provided drillings, insert the bolts but do not tighten. Remark : place the
mounting piece on the inside on a level with the principal piece of the tow bar. Insert the bolts and
washers and tighten everything firmly (see tension).
5)
Hang the exhaust back in the filling up rubber and replace the spare wheel.
6)
Assemble the ball. Use plate (3) only for the assemblage of a 50V.
Composition
Tow bar reference 1470
4 bolts M10x130 - DIN931
6 nuts M10 - DIN934
6 security washers M10 - DIN128A
8 washers 40x35x12x4mm
4 washers 40x35x12x4mm
10 security washers M12 - DIN128A
10 bolts M12x35 - DIN933
2 washers 24x13x2mm
2 bolts M10x100 - DIN931
Note
Please consult your cardealer or owners manual for the maximal permissable towing mass.
Remove any bitumen coating on the fastening position for the tow bar.
When drilling, be carefull not to damage any brake lines, electrical wiring or fuel lines.
(D)
4 washers 20x10,5x2mm
(A-D)
1 mounting piece left (7)
(A-D)
1 mounting piece right (6)
(D)
10 nuts M12 - DIN934
(E)
2 tubes 19x3x63,5mm (1)
(B-C-E)
1 mounting piece left (5)
(B-C-E)
1 mounting piece right (4)
(C)
2 mounting pieces L + R (2)
(A)
All bolts and nuts : quality 8.8
(A)
(D-E)
(D-E)
(B-C-E)
(A)
(A-C)
(A-C)
(A-B)