Diagram
Not Shown
Not Shown
AC‐16 Convection Blower
The Tranquility wood stove was also designed for use with a convection blower for
additional heat circulation. The stove is constructed with rear and top convection channels
which allow the room air blower to pick up heat from the hottest regions of the stove and
transfer it into the home. The mounting screws for the blower are installed into the rear
convection channel at the factory; mounting the blower only requires a 5/16" open end or
socket wrench to remove these screws and install the blower. When routing the power cord,
take care to keep away from hot areas of the unit and remember that this blower is for use only
with the stove. Please see the diagram below for clarification on the room air blower
installation.
(4) 5/16" head, self tapping
screws (pre‐installed in unit).
The optional heat circulation blower on this stove requires periodic lubrication; this lubrication
should be performed no less than every three months of normal operation. To properly lubricate the
blower, use an eye dropper or similar dispensing device to drip 5-7 droplets of SAE 20 oil into the
Page | 24
oil port on the side of the blower motor.
REPLACEMENT PARTS LIST
Description
No.
1
Air Control Slider
2
Outside Air Adapter
3
Right Vermiculite Panel
4
Left Vermiculite Panel
5
Rear Vermiculite Panel
6
9" x 4" x 1.25" Firebrick
7
Top Vermiculite Baffle
8
Door Gasket [5/8" dia HD]
9
Window Gasket
10
Ceramic Glass Panel
11
Window Retaining Brackets
12
Cast Iron Door
13
Secondary Tube (Front)
14
Upper Refractory Baffle
15
Secondary Tube (Rear)
Large Spring Handle
Air Control Spring Handle
OPTIONAL ACCESSORIES
Part No.
Per Unit
AC‐17ACS
1
AC‐17OAA
1
AC‐17RBR
1
AC‐17RBL
1
AC‐17RBB
2
AC‐SB
4
AC‐17RBT
1
AC‐DGKNC
1
AC‐GGK
1
AC‐G40
1
AC‐GS16
2
CA‐16
1
AC‐17BTF
1
AC‐17URBVL
1
AC‐17BTR
1
AC‐SH (Brass)
1
AC‐SHN (Nickel)
AC‐SH4 (Brass)
1
AC‐SH4N (Nickel)
Warning
Disconnect the
electrical power from
the fan before
installation.