ARIETE Futurmat F3 Mode D'emploi page 11

Table des Matières

Publicité

Les langues disponibles
  • FR

Les langues disponibles

  • FRANÇAIS, page 17
ATTENTION:
CHECK: * That the voltage, cable section and rating of the magnetothermal circuit breaker (3) (20A) are correct
for each model.
* That the drainage pipe (4) has a minimum diameter of 35 mm.
* That the main tap (5) has a 3/8 Gas thread.
1.- Place the products as shown in the drawing (depending on the models, the pump motor (8), is located inside
the machine). In this case the pipe (A) is connected directly to the lower tap (6c) of the water purifier (6).
NOTE: The grinder may be installed on either side of the machine.
ATTENTION: The cables for connection to the mains and the pump (in
models with the pump installed outside the machine) are in the lower
front part of the machine.
To pull out the cables to connect to the mains, proceed as follows:
remove the cover (1) and the lower tray (2), cut the ties securing the
cables to the chassis, then replace the cover (1) and the lower tray (2)
in their place.
2.- Connect the drainage pipe (B) to the funnel (2p) on the machine and the drainage pipe (4).
3.- Connect the pipe (short flexible tube) (C) between the main tap (5) and the upper tap of the water purifier
(6b).
4.- Connect the pipe (short flexible tube) (D) between the lower tap of the purifier (6c) and the inlet to the pump
(8a). (According to model and diagram)
NOTE: Before connection to the pump inlet (8a), open tap (5) and allow water to circulate through the
purifier system (6) for 2 minutes to eliminate any possible dirt remaining in the circuit.
5.- Connect the pipe (long flexible tube) (A) between the machine inlet and the output from the pump (8a).
6.- Open the main tap (5) and check that there are no leaks in the circuit.
7.- Connect the cable (E) to the pump motor connection box (8c). (According to model and diagram)
8.- Connect the cable (F) to the thermo-magnetic switch (3) (20A), in the following order: First the mass cable,
then the cables of the active part; and in the case of having to disconnect at any time, effect the inverse
operatión, that is, first the cables of the active part and then the mass cable
NOTE:
Make sure that the earth connection is correctly i n stalled and in accordance with current
legislation.
9.- VERY IMPORTANT.- Before arming the magnetothermal circuit breaker (3), position switch (2l) on the
machine in "2" (OFF
10.- Arm the magnetothermal circuit breaker (3), positioning it in the "ON" position.
11.- MACHINES WITHOUT AUTOMATIC LEVEL: Fill the machine with water by pressing the control of the fill
tap (2m) until the level reaches 3/4 of the height.
MACHINES WITH AUTOMATIC LEVEL: Place the switch (2l) in the "2" (OFF
will automatically begin to fill with water until reaching the ideal level. On the machines equipped with the
boiler level indicator lights (2e), the upper green light indicates the level is correct, the lower red light
indicates boiler
refill.
machine is refilling.
NOTE: The machines with automatic level are equipped with a safety level system. If the boiler is filling,
and the keypad lights (2c) or the boiler level indicator lights (2e) begin to blink, this indicates that
the water level alarm has been activated. Proceed as indicated on page 11.
12.- With the machine filled to level (3/4 parts).Place the switch (2i) in "1" (ON) (Wait 30 minutes for the
machine to come up to temperature)
N.B. Never operate the switch (21) without the machine being at the proper level (3/4 full).
INSTALLATION
)
On the G6 / V6 models, the level indicator is a symbol which lights up when the
9
) position. The machine

Publicité

Table des Matières
loading

Table des Matières