Installation; External Overload Signalling; Maintenance - Simco-Ion CM Medium Notice D'utilisation

Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

8.3.2. Installation

To activate the Remote Voltage Program function, pins 17 and 18 of the Sub-D connector must
first be connected together. Next, a power supply can be connected between pin 3 (+) and pin
16 (GND). The output voltage can now be externally regulated from 0 kV to maximum with 0 to
10 V.
(see also the diagrams in the appendix)
Attention:
When the Remote Voltage Program function is not (no longer) required:
-
Remove the connection between pins 17 and 18 on the Sub-D connector or remove
the Sub-D connector.

8.4. External overload signalling

An overload (Chap. 7) can also be signalled externally. It can be indicated by a external led
lighting up or by sending a signal to a PLC, for instance.
8.4.1. Installation
The overload connection on the Sub-D connector is an optocoupler output and is therefore
electrically isolated (Pin 22 = open emitter, Pin 9 = open collector). Connect the external
overload as shown in the appended diagram.
Maximum load 50VDC, 50mA.
(see also the diagrams in the appendix)

9. Maintenance

- Keep the unit dry and free of dust, dirt and chemicals.
- Regularly check the generator earthing.
- Regularly check the high-voltage connectors and cables for mechanical or electrical damage.
- The generator does not contain any parts that require periodic maintenance.
CMMedium_UM_9752099010_NL_D_GB_F_V1_0
34

Publicité

Table des Matières
loading

Table des Matières