1. INTRODUCTION
1.1 PRODUCT DESCRIPTION &
INTENDED USE
Thank you for choosing a NewMotion Electric Vehicle
(EV) Charge Point.
This charge point is intended to charge the batteries
within EVs compatible with IEC-61851 MODE3 definition
and requirements. Dedicated EV specific plugs will
need to be utilised. No adaptors, conversion adaptors
or extension sets for cables are allowed to be used. EVs
and cables used with this charge point should always be
undamaged and in their original state.
1.2 SAFETY WARNING + CAUTION!
The electrical system must be voltage-free during the
entire installation procedure. Failing to do so can lead to
serious injury or even death. The installation procedure
must be carried out by a trained electrician who works in
accordance with all relevant local laws and regulations.
Do not install in potentially explosive atmospheres and/
or zones with high electromagnetic radiation and/or
in flood-prone areas. The charge point is connected
to the electricity grid and even if the equipment is
switched off, hazardous voltages may be present at
the input terminals. Always switch off the AC supply
before starting any work on the charge point and/or its
installation. Do not carry out any work in rainy conditions
or when the humidity is above 95%. The safety
guidelines are intended to ensure correct installation
and usage. Any failure to comply with the valid safety
guidelines or instructions provided in this manual may
result in fire, electrocution or severe injury.
The charge point is a product in Safety Class I and
is supplied with an earth terminal for protection
purposes. The AC input clamps must be fitted with an
uninterruptible earth for protection purposes. Ensure
that the connection cables are fitted with fuses and
circuit breakers. Never replace a protection component
with another type. First check the full installation to
determine if that component can be used with the
existing installation components.
Before you switch on the charge point, check that
the available power source matches the configuration
settings of the product, as described in this manual.
INSTALLATIEHANDLEIDING – P17
INSTRUCTION MANUAL – P17 | P17
Tripping of the RCD could be caused by an earth fault
or a defect relay. If, after resetting the RCD, the device
cannot be activated or immediately trips again; please
contact your installer.

1.3 LEGAL DISCLAIMER

This manual is created for you with care.
We however do not guarantee that all information is
complete, accurate and correct. We strongly advise
you to have our product installed by ZE-Ready certified
professionals. How our product should be installed
and used depends on local circumstances and local
and national regulation, which are not mentioned in
our manual. NewMotion is not responsible for any loss
or damage whatsoever caused – including without
limitation, any indirect, personal or consequential loss or
damage - arising from or in connection with the use of
this manual. Nor does NewMotion accept any liability for
any such loss or damage arising out of your reliance on
any information contained in this manual.
VERSION 0129NM02INT01
0520NM19INT03

Publicité

Table des Matières
loading

Ce manuel est également adapté pour:

Renault edition home basic 11 kw

Table des Matières