Télécharger Imprimer la page

KERN DBS-A01 Mode D'emploi page 13

Publicité

Les langues disponibles

Les langues disponibles

 The second temperature point to be tested will
be displayed.
 Confirm with the ENTER button, the second
heat-up phase is started.
 Temperature calibration for the second point
takes 15 min. Compare the displayed tempera-
ture value on the thermometer with that of the
moisture analyser whilst the temperature dis-
play is flashing. If the two values do not match,
correct them using the navigation buttons  
and confirm with the ENTER button. Numeric
input see operating instructions KERN DBS,
chap. 7.1.1.
 The adjustment is completed when "END" is
displayed. The appliance returns to the menu
automatically.
The adjustment protocol output is started upon
connection to an optional printer and activated
GLP function. (see operating instructions KERN
DBS chap. 6.3).
 Press ESC to return to Moisture analysis mode.
• The adjustment protocol output is started upon connection to an
optional printer and activated GLP function. (see operating instruc-
tions KERN DBS chap. 6.3).
DBS-A01-BA-def-1920
13

Publicité

loading