Operation - Highfield Classic Manuel Du Propriétaire

Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

Operation

1. Inflation
a- Valve cap
b- Plunger
a) To inflate the chamber, first unscrew the valve cap by turning a quarter of a turn counterclockwise. Check
that the plunger in the center of the valve is closed i.e. upper position. If closed i.e. spring compressed, down
position, push the plunger down and rotate to the closed position.
b) Connect the air pump to the valve, rotate the connector into the valve to lock it and start inflating. No matter
you used foot pump or electrical, please do not inflate over the maximum air pressure 0.25 Bar per chamber.
c) Use air gauge to measure the tube pressure.
d) Be sure to inflate each chamber in turn according to the sequence shown below. Do not inflate a chamber
completely then move on to the next one. Start with the rear chambers. Repeat procedure until all chambers
are evenly inflated to the recommended working pressure.
CL260-380
CL420

Publicité

Table des Matières
loading

Table des Matières