Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

6. Set up

■ MOUNTING ENGINE (SE1)
1. Push the driveshaft housing toward the
clutch housing and rotate it by hand to
SE1
check that the driveshaft is engaged
with the gears.
2. Insert the driveshaft housing into the
clutch housing until it bottoms, and
align the positioning holes on the clutch
housing and the shaft tube and install
the screw. When difficult to engage,
twist the engine slightly.
3. Fasten the clamp securely with two
screws.
Tighten the screws gradually by turns.
■ CONNECTING THROTTLE WIRE
SE2
1. Remove the air cleaner cover.
2. Connect the end of the throttle wire to
the joint on the top of the carburetor.
(SE2)
■ CONNECTING SWITCH WIRES
• Connect the switch wires between the
engine and the main unit. Pair the wires
of the same color.
■ INSTALLING HANDLE
SE3
• Mount the handle to the shaft tube and
clamp it at a location that is comfortable
to you. (SE3)
(1) About 19 inches (48cm)
(1)
■ INSTALLING DEBRIS GUARD
SE4
• Put the debris guard on the gear box,
attach it with the screws and hardware
provided. (SE4)
IMPORTANT
■ INSTALLING LINE HEAD (SE5)
SE5
1. While locking the gear shaft, by
inserting the supplied tool into the
upper holder on the gear box, loosen
and remove the hexagon nut(left-
handed)
2. Fit the line head assembly to the gear
shaft over the holders. Hand-tighten it
securely.
IMPORTANT
• You need not holder (B) and nut when
installing the cutting head.
• Do not attach any metal blade to
BCZ2450T.
BCZ2450S/T
U
S
US-9

Publicité

Table des Matières
loading

Table des Matières