Installation
Ceiling support structures
• This vent hood is heavy. Adequate structure and support
must be provided in all types of installations.
• At the hood location, install 2"x 4" cross framing between
ceiling joists as shown (2"x 4" are required to support
the weight of the hood).
• Arrange cross framing in the ceiling to suit the existing
structure.
Your ceiling joists will be like one of the following:
Example A
NOTE: Top view ceiling joists
parallel to front of hood
7
⁄
"
1
16"
1 6
(17.9cm)
(40.6 cm)
joist spacing
Example B
NOTE: Top view ceiling joists
parallel to front of hood
16"
(40.6 cm)
over duct/cooktop
joist spacing
7
⁄
"
1
1 6
(17.9cm)
Example C
NOTE: Top view ceiling joists
parallel to front of hood
10
⁄
" (25.5 cm)
1
1 6
install cross-framing
symmetrically over
duct/cooktop
7
⁄
"
1
1 6
(17.9cm)
16"
(40.6 cm)
joist spacing
Hood front
10
⁄
" (25.5 cm)
1
1 6
install cross-
framing
symmetrically
over duct/cooktop
Centerline
Ø 8
⁄
" (21
1
4
cm) duct
2 x 4 cross
framing
Align duct to
center of cooktop
Hood front
10
⁄
" (25.5 cm)
1
1 6
install cross-
framing zz
symmetrically
Centerline
2 x 4 cross
framing
Ø 8
⁄
" (21
1
4
cm) duct
Align duct to
center of cooktop
Hood front
Centerline
2 x 4 cross
framing
Ø 8
⁄
" (21
1
4
cm) duct
Align duct to
Cooktop
center of cooktop
outline
Install Range Hood
1
Place the template in the ceiling considering the
instructions for ceiling support structures.
: Always consider the front of hood legend when
NOTE
playing the template on the ceiling.
It will define the control's location.
2
Mark with a pencil the hole locations for screws and
duct in the ceiling.
Cooktop
outline
3
Fix the upper horizontal support with 4 - 5x45 mm
screws.
Cooktop
outline
4
Install transition on top of hood (if removed for shipping)
with 4 - 4 x 8 mm sheet metal screws.
A
B
A. Vent transition
B. 4 x 8 mm screws
7