Service & Maintenance - Altrad BELLE PCLX 12/40E Manuel De L'opérateur

Table des Matières

Publicité

GB
Maintenance
The Altrad Belle 'PCLX 12/40E' is designed to give many years of trouble free operation. It is recommended that an approved Altrad
Belle dealer carries out all major maintenance and repairs. Always use genuine Altrad Belle replacement parts, the use of spurious
parts may void your warranty. Before any maintenance is carried out on the machine, switch off the motor and disconnect the power
supply.
Always set the 'PCLX 12/40E' on level ground to ensure any uid levels will be correctly read. Only use recommended oils (see chart
below).
Running In Period
The vibrator shaft case oil must be replaced after the rst 100 hours use, then after every 500 working hours. For detail on vibrator
shaft case oil replacement, see 'Vibrator unit'. The belt tension should be checked after 4 hours use.
Cleaning
This is an electrical appliance. During cleaning, the electrical components of this machine MUST NEVER be exposed to water or liquid
of any kind as this could result in serious injury or even death!
Routine Maintenance
Cables
Drive Belt
Oil / Fuel Type & Quantity
Vibrator
Plug
Seal
Regular
Level
Lower part of screw thread
Service & Maintenance
Check
Tension
Quantity
Oil Type
SAE 10w40
Vibrator Unit.
Remove the plug complete with seal, check that the oil level reaches the bottom thread on the oil
plug hole. Top up as necessary with the correct oil (see chart).
Each Use
Replace when necessary
Fuel Type
(Litre)
0.22
N/A
14
Before
First 4
Hours
Capacity
Spark Plug
(Litre)
Type
N/A
N/A
First
3 Months /
Month /
50 Hours
20 Hours
Electrode
Gap (mm)
N/A

Publicité

Chapitres

Table des Matières
loading

Table des Matières