5. Drainage piping work
Outdoor unit drainage pipe connection
When drain piping is necessary, use the drain socket or the drain pan (option).
ZM100-140
Drain socket
PAC-SG61DS-E
Drain pan
PAC-SH97DP-E
6. Electrical work
6.1. Outdoor unit (Fig. 6-1, Fig. 6-2)
1 Remove the service panel.
2 Wire the cables referring to the Fig. 6-1 and the Fig. 6-2.
B
L N
S1
S2
S3
D
For Power
For Power
D
B
S1
A
S2
S3
A Indoor unit
B Outdoor unit
C
C Remote controller
D Main switch (Breaker)
E Earth
A
A
E
C
E
Fig. 6-1
■
ZM100-140
A
F Termial block
E
G Indoor/Outdoor connection terminal block (S1, S2, S3)
H Service panel
I Clamp
* Clamp the cables so that they do not contact the center of the service panel or the gas valve.
J Earth terminal
Note :
If the protective sheet for the electrical box is removed during servicing, be sure to
reinstall it.
Caution:
Be sure to install N-Line. Without N-Line, it could cause damage to unit.
■
ZM100-140V
■
ZM100-140Y
Fig. 6-2
L N
S1 S2 S3
L1 L2 L3 N
S1 S2 S3
11