Drainage Piping Work; Electrical Work; Power Supply Wiring - Mitsubishi Electric CITY MULTI PCFY-P40VKM-E Manuel D'installation

Masquer les pouces Voir aussi pour CITY MULTI PCFY-P40VKM-E:
Table des Matières

Publicité

Les langues disponibles
  • FR

Les langues disponibles

  • FRANÇAIS, page 14

5. Drainage piping work

Fig. 5-2

6. Electrical work

L
Fig. 6-1
All manuals and user guides at all-guides.com
• For left side tubing, be sure to insert the rubber plug into the right drain port. (Fig.
• Use VP-20 (O.D. ø26 (1") PVC TUBE) for drain piping and provide 1/100 or more
• After completion of work, check that correct drain is available from the outflow
Fig. 5-1
Installing procedures (Fig. 5-2)
1. Attach the joint socket 5 supplied with the unit to the drain port on the unit with a
2. Fasten the socket cover 6 supplied with the unit to the joint socket 5.
3. Attach the field drain tubing (VP-20) to the joint socket 5 with a vinyl chloride
4. Wrap the drain tubing cover 7 supplied with the unit. (Seam taping)
5. Check for correct drainage. (Fig. 5-3)
* Fill the drain pan with water of about 1 L from the air outlet.
Fig. 5-3
6.1. Electric wiring (Fig. 6-1)
Wiring procedures
1. Remove the tapping screw C then remove the beam.
2. Remove the (2) tapping screws B then remove the electric part cover A.
3. Connect the electric wires securely to the corresponding terminals.
4. Replace the removed parts.
5. Tie the electric wires with the local wiring clamp located in the right side of the
A means for the disconnection of the supply with an isolation switch, or similar de-
vice, in all active conductors shall be incorporated in the fixed wiring.
* Label each breaker according to purpose (heater, unit etc.)

6.2. Power supply wiring

• Wiring size must comply with the applicable local and national codes.
• Install an earth line longer than other cables.
• Power supply codes of appliance shall not be lighter than design 60245 IEC 53
• A switch with at least 3 mm contact separation in each pole shall be provided by
Power cable size : more than 1.5mm² (3-core)
Never splice the power cable or the indoor-outdoor connection cable, otherwise it
may result in a smoke, a fire or communication failure.
► Use earth leakage breaker (NV).
For breaker, means shall be provided to ensure disconnection of all active phase
conductors of the supply.
5-1)
downward slope.
port of the drain tubing.
A Drain pan
B Plug
C Insert the driver etc.in the plug deeply.
vinyl chloride adhesive.
adhesive.
A Drain pan
B Drain tubing
C Socket cover 6
D Joint socket 5
E Drain tubing cover 7
F Stopper
G Instertion length 37mm
junction box.
A Cover
H Terminal block for transmission cable
B Set screws (2 pcs)
I Address board
C Set screws (Beam)
J Terminal block for MA Remote controller
D Wiring clamp
i Secure with the wiring clamp.
E Control board
F Wire service entrance
G Terminal block for power supply
or 60227 IEC 53.
the air conditioner installation.
Warning:
5

Publicité

Table des Matières
loading

Table des Matières