Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

P 700 T
 7. Pump 5...10 times to ventilate the ventilation channels.
 8. Turn the pressure relief valve clockwise until it is tightly closed.
 9. Connect the pressure hose to the MINIMESS
connection.
 10. Tightly screw the MINIMESS
 11. Select suitable adapters and seals for the connection of the test sample.
 12. Screw the adapter for the test sample onto the MINIMESS
 13. Turn the test sample with seal in the adapter.
IMPORTANT! Do not tighten the test sample yet!
 14. Pump until the hydraulic oil escapes at the connection of the test sample. The pressure
hose and the test sample connection are now ventilated.
 15. Tighten the test sample.
5

Operation

CAUTION! Material damage to valve stop!
If the stop and the P 700 T are put under too much strain, they will be damaged.
 When the stop has been reached, tighten the valves (fine adjustment and pressure
relief valve) only hand-tight.
Read before pressure generation:
Before you generate pressure with the P 700 T, check whether the following requirements
are met:
 The support surface of the P 700 T is level and has a flat surface.
 The reference is connected to the P 700 T.
 The test sample is connected to the pressure hose with suitable adapters and seals.
 All pressure connections have a correct and pressure-resistant seat.
 The P 700 T, the pressure hose and the test sample have been
properly ventilated ( § 4).
 Turn the seal to the appropriate position:
• "C L O S E" for transport and storage,
• "V E N T" for ventilation / generating or releasing pressure and
• "O P E N" for checking the oil level / refilling / replacing.
Technical changes reserved
®
connection of the P 700 T, and tighten the
®
adapter on the pressure hose.
Operation
®
adapter.
- 31 -

Publicité

Table des Matières
loading

Table des Matières