Télécharger Imprimer la page

Güde GHS 1000 Mode D'emploi page 12

Masquer les pouces Voir aussi pour GHS 1000:

Publicité

Les langues disponibles
  • FR

Les langues disponibles

  • FRANÇAIS, page 14
Operation
Step-by step Instructions
1.
Hang the counter pulley (pic. 1/8) hook (pic. 1/7), which the rope (pic. 1/9) is attached to, safely on the load drawn.

2.
Push the stretching spring (5) to the slackening position (up), thus releasing the interlock (4).
3.
Rope may be unwound if the detention lever (2) is held in the release position. Hold the detent lever (2) pressed and pull the
stretching pulley to the other spot of hanging!
Caution: Travel 1 m max. (#55129) 1,3 m max. (#55130)
4.
Push the stretching spring (5) to the tensioning position (down), the interlock will thus snap (4) in the pulley.
5.
Now, pump the lever with a stretch-slackening spanner. The rope will gat wound on the pulley again and the load is drawn in the
required position.
6.
Push the stretching spring (5) to the slackening position (up), thus releasing the interlock (4). If the interlock is unblocked, the
load carrying hooks may be removed again.
Attention! The load could break away suddenly.
Caution: On a slope, the load should be secured against slipping!
Troubles – Causes – Troubleshooting
Trouble
Retaining pawl will not unblock
Stretch-straightening spanner does not work


Cause
1.
1.
Broken spring
Broken spring


Troubleshooting
1.
Replace the spring
1.
Replace the spring

Publicité

loading

Ce manuel est également adapté pour:

Ghs 20005512955130