Drilling The Holes In The Thrust-Tunnel; Protection Of The Bow Thruster Against Corrosion - Vetus BOW PRO Série Instructions D'installation

Masquer les pouces Voir aussi pour BOW PRO Série:
Table des Matières

Publicité

Les langues disponibles
  • FR

Les langues disponibles

  • FRANÇAIS, page 45
3 .6

Drilling the holes in the thrust-tunnel

Mark the installation position of the bow thruster by means of the
intermediate flange.
Use the drill pattern supplied, to determine the correct position of
the holes to be drilled.
Important: The pattern of the holes must be positioned precisely on
the centreline of the tunnel.
Consult the template for the dimensions of the holes to be drilled.
Drill the holes through the thrust tunnel and take care that the holes
are free of burrs.
3 .7

Protection of the bow thruster against corrosion

To prevent corrosion problems, do not use copper based anti-foul-
ing. Cathodic protection is a 'must' for the protection of all metal
parts under water and the bow thruster is supplied with a zinc anode
for this purpose.
Corrosion of a steel or aluminium thrust tunnel can be reduced by
ensuring that the tail piece is completely insulated from the thrust-
tunnel.
NOTE: The gaskets supplied are already electrically insulated. How-
ever the bolts and the shaft need to be fitted with insulation mate-
rial, for example nylon bushes.
vetus® Installation instructions BOW PRO Series Thrusters: BOWA0572
22 (
7
/
") 22 (
7
/
")
8
8
ø 30 (1
3
/
")
16
ø 9 (
3
/
")
8
ø 9 (
3
/
")
8
ø 9
(
3
/
")
8
37 (1
29
/
")
77 (3
1
/
")
64
32
Insulation bush
Gasket
Insulation bush
Insulation bush
ENGLISH
25
020805.01

Publicité

Table des Matières
loading

Ce manuel est également adapté pour:

Bowa0572

Table des Matières