Télécharger Imprimer la page

Supra NÉO 100 Notice D'installation Et D'utilisation page 20

Publicité

Les langues disponibles
  • FR

Les langues disponibles

  • FRANÇAIS, page 1
HEARTH NEO 100
(without DA 1000 option)
ASSEMBL
ASSEMBLY
Y
Requires 2 people:
1.
Supporting wall (M0 class materials)
2.
Decorative hood (optional)
3.
Decompression hole
4.
Air access through the casing (600 cm2)
5.
Rear stop (depending on assembly)
6.
Flue pipe
7.
Connection sleeve (not supplied) (1)
8.
Connection pipes Ø 180 (not supplied) (1)
9.
Insulated casing
10. Hot air outlet grille (not supplied) (1)
11. Insulation (if necessary)
12. Combustion air connection (depending on installation)
13. Hot air connections Ø 125 or 150 (not
supplied) (1)
14. Hot air diffuser (not supplied) (1)
15. Wooden beam (depending on model)
16. Beam protection (not supplied) (1)
17. Hot air damper (2)
18. Hearth support (1)
19. Fan (depending on model) (1)
(1)
Accessory available from your dealer.
(2)
Included in the DA100 casing kit
ASSEMBLING THE HEARTH
Attach the air connection collar if necessary (specific
instructions).
Place the hearth on runners or legs (PS 1000 optional)
Attach the hearth to the support in its final location. It is crucial
that the appliance is perfectly level, especially to guarantee its
stability. Optional adjustable base (PS 1000)
Attach the frame's lower cross member using the supplied
screws. The hearth is now ready to be connected.
Optional PS
1000 feet
(not included)
Lower cross member attachment
(With the DA 100 casing kit option)
HEARTH TYPE ASSEMBLY
HEARTH
(with casing
option)

Publicité

loading