Foot Shell Removal & Foot Spring Replacement - Blatchford EliteVT Instructions D'utilisation

Masquer les pouces Voir aussi pour EliteVT:
Table des Matières

Publicité

Les langues disponibles
  • FR

Les langues disponibles

  • FRANÇAIS, page 14
8 Foot Shell Removal & Foot Spring Replacement
Use appropriate health and safety equipment at all times including
extraction facilities.
Be aware of finger trap hazard at all times.
1.
13A/F
Remove toe spring screws (13A/F spanner
940273).
3.
Rotate the carrier/heel spring assembly toward
the rear of the foot to dis-engage the spring
from it's location in the shell.
5.
Attach the toe
spring to the carrier
using Loctite 243
(926012) on the
bolts.
1. For spring rates 1 to 7 use 4 A/F Allen
wrench and torque to 15 Nm. Do not use
external hex, this is reserved for loosening
the bolt, if required.
2. For spring rates 8 and 9 use 13 A/F
spanner and torque to 25 Nm.
2.
Withdraw toe spring from shell.
4.
Undo and remove heel spring screws. Assemble
new heel spring onto carrier, use Loctite 243
(926012) and torque to 15 Nm. Use special Allen
wrench 940080, Torque spanner adaptor 940081
or 13A/F spanner 940273
6.
If a foam cosmesis is to be fitted, roughen top
surface of foot shell to provide ideal bonding
surface.
8
Heel Spring
938289S/2-0120

Publicité

Table des Matières
loading

Ce manuel est également adapté pour:

Evt22l11sEvt30r94sEvt22l11sdEvt30r94sd

Table des Matières