Installation; Preparatory Work - G-U B-2193 Série Instructions De Montage

Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

Installation instructions
B-2193x | B-2393x
Motor-driven shoot-bolt lock for timber and steel doors
NOTE
46
3.

Installation

3.1

Preparatory work

Before starting the installation, check that all the required products are complete and functional.
Correctly mount/deburr or check profile cutouts, door hardware drill holes and cable bushings in
accordance with Appendix A3 or the relevant enclosed installation instructions.
Check existing cutouts etc. for correct seating.
Thoroughly remove any swarf in the profile.
Attention electronics: make sure the lock recess is free of swarf and clean!
Retract the connecting cable on the secured side of the door. Take care not to bend the cable.
Provide for a sufficiently large cable loop (~50 mm).
Protect the connecting cable against abrasion.
(Recommendation: use protective hose B 5490 0308)
Provide a cable disconnection point in the area of the cable link to make it easier to remove the door.
Max. cable length from the lock to the controller/junction box is 10 m (length of pre-assembled
cable). In addition, larger cable cross-sections may be required to prevent voltage drops (see Fig. 2).
Length of connecting cable B 5490 0300 (in m)
10
2
A (mm
)
Extension (in m)
0.34
12
LA
Fig. 2: Cable lengths
EN
8
6
4
14
16
18
LB
Distributor/
Branch
2
LA
20
LB
Control unit
06.2019 | 22288S | Designed in Germany

Publicité

Table des Matières
loading

Ce manuel est également adapté pour:

B-2393 série

Table des Matières